Prime Build

  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact
  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact

Projects

  • All
  • Retail
  • Education
  • Government/Care
  • Rollout

ALDI Balgowlah, NSW

ALDI Balgowlah, NSW

Prime Build’s scope involved the demolition of existing structures, remediation of the contaminated site, the construction & fitout of a new retail store, minor tenancy and associated car parking.

This project had a heavy focus on structures, including circa 200 screw piles, suspended slab to retail floor, precast panels to perimeter walls, structural steel, installation of two passenger lifts, dock leveller and major utility upgrades to the site.

This project was completed in late February 2019, ready for ALDI to commence trade.

  • Client
    ALDI
  • Market
    Retail

Woolworths Millers Junction, VIC

Woolworths Millers Junction, VIC

Prime Build were engaged to manage the installation of shopfitting with state-of-the-art technology features to the brand new flagship stores at Millers Junction, VIC.

The works undertaken to the store and BWS included installing all shopfitting item supplied by Woolworths for the staff amenities, new checkouts, the trading floor, throughout the bakery, deli, meat area and all BOH areas.


Our client required additional works completed it was a challenge to manage the safety of the store team working in a live environment construction site.

It involved constant communication with the stores operating team to ensure key areas of the store had time to prepare and train staff prior to the new refurbished areas opening to customers.

  • Client
    Woolworths
  • Market
    Retail

David Jones The Glen, VIC

David Jones The Glen, VIC

Prime Build are proud to deliver the David Jones flagship store within The Glen precinct.

Our team worked collaboratively with numerous project stakeholders to deliver this high end 6000m2 fit out amidst extremely testing conditions and constrained timeframes.

Works consisted of custom flooring, bespoke joinery, contemporary fixtures and fittings, full services infrastructure, feature lighting and coordination of specialty retail shopfitting companies.

  • Client
    David Jones
  • Market
    Retail

Coles The Glen, VIC

Coles The Glen, VIC

Prime Build completed the Coles The Glen refurbishment works over a 18 week period.

The scope consisted over a conversion of the bakery and deli areas, modifications to shop-front checkouts, lighting upgrade, complete remove of the existing vinyl and replacing the floors with a polished concrete floor to the existing slab , sales floor walls, sales floor ceilings and back of house painting upgrades.

The works were completed out of hours while the store continued to trade during the day and early evening. Prime Build were able to ensure the client was able to continue to trade each day and was presented with a clean store prior to store opening every morning.

  • Client
    Coles
  • Market
    Retail

ALDI McGraths Hill, NSW

ALDI McGraths Hill, NSW

ALDI McGraths Hill’s scope of works was broken into a series of sequenced stages over a 6 month programme to provide a major extension to the retail floor space.

The extension involved a large suspended slab, structural steel structure & trussed roof, and a precast lift shaft to house a new passenger lift. The works were completed with ALDI’s new specified finishes & fixtures requirements and handed back to the store team to trade. Prime Build then took possession of the next stages.

Stage 3 included major demolition of the existing store entry ramp and a portion of the existing retail floor. Existing structural steel was modified and new steel / roof sheeting was installed across the store to then permit the construction of a new entry ramp. The store was also shutdown for a portion of stage 3 for store refurbishment works.

The significant staging & HAZMAT latent conditions were overcome by the delivery team to deliver this great looking store to the local community safely.

  • Client
    ALDI
  • Market
    Retail

BWS Chelsea, VIC

BWS Chelsea, VIC

Prime Build were engaged to deliver a full refurbishment at BWS in Chelsea, VIC

Works undertaken to BWS included new LED lighting throughout, refrigeration and condenser unit. The store also received new format finishes including flooring, internal /external signage, a complete new shopfront, gondolas and counter.

Project duration was carried out over 4 weeks working with multiple BWS stakeholders across operations, renewal, design and store development.

Practical completion was achieved mid-November 2019 and was well received by customer’s and the client.

  • Client
    BWS
  • Market
    Retail

  • < Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • Next >

© Copyright Prime Build Pty Ltd

  • Contact
  • News
  • Sitemap
Website by Big Red Dog