Prime Build

  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact
  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact

Projects

  • All
  • Retail
  • Education
  • Government/Care
  • Commercial
  • Rollout

UNIQLO Blacktown, NSW

UNIQLO Blacktown, NSW

Prime Build have been engaged by high end Japanese retailer UNIQLO to exclusively expand their retail footprint across Australia over the next few years.

The second store launch, as part of this multi-year program, is located in Sydney’s western suburbs in Blacktown.

The project delivers UNIQLO’s high specification and meticulously presented store layout to customers. Our scope involved all floor, wall and ceiling linings, electrical and fit out trades including management of shop fitting and other specialist trades. Careful coordination of Landlords’ works was required to avoid delays to the store opening. We are proud to be working alongside this amazing international brand for the years to come.

  • Client
    Uniqlo

ALDI Salamander Bay, NSW

ALDI Salamander Bay, NSW

Prime Build have completed ALDI’s newest stand-alone store in Salamander Bay.

The project involved a large civil scope with construction of a sizeable OSD area, integrated landscape vaults and an open format carpark.

This new ALDI Concept Store includes office/ amenities and a mezzanine plant deck, housing all plant and equipment.

Prime Build delivered this much awaited project successfully and on time despite challenges encountered with supply and labour shortages and considerable rain interruptions in 2022.

  • Client
    ALDI
  • Market
    Retail

McDonald’s Warrawong, NSW

McDonald’s Warrawong, NSW

This refurbishment of the McDonald’s in Warrawong included a full refurbishment of the dining area, kitchen, bathroom and playland as well as an extension to the kitchen.

To allow the restaurant to continue to trade, several live environment practices were implemented. Firstly, exclusion zones were created within the restaurant using hoarding while the dining area had work done. This meant that the store could still trade for walk in customers (served at the front counter) as well as drive thru.

The project was also done in stages to allow the restaurant to continue trade with the team working efficiently to make the most of good weather and complete external façade works and limit the time required to shut down the drive thru of the restaurant.

Through effective communication between the client and all other stakeholders, the team pulled together to deliver Prime Build’s first refurbishment for Mcdonald’s.

  • Client
    McDonald's
  • Market
    Retail

Winmalee Village, NSW

Winmalee Village, NSW

Prime Build’s scope for the Winmalee Village included an extension of external eating areas, installation of lift and shaft, 5 office complex fit outs, pylon signage and shade sail installation.

Set in the small town of Winmalee, Prime Build completed works in a live environment operating around foot traffic and a lot of local interest in the works.

Working closely with the centre manager and local business was key to finishing up defect free in this live environment.

  • Client
    ISPT
  • Market
    Retail

ALDI Salisbury, QLD

ALDI Salisbury, QLD

Prime Build pulled together to give the ALDI store in Salisbury an extension and a full refurb.

The first stage of the works was completed in a fully operational store with internal intrusive works performed outside of operating hours. To minimise disruption even further, we installed new temporary refrigeration equipment while removing existing equipment.

The second stage saw the store shut down for two weeks to expand the selling floor, fully refurbish the entire store and install and commission new refrigeration, coolrooms & freezers. Despite inclement weather affecting works on site, the project was completed on time and of high quality with a delighted client.

  • Client
    ALDI
  • Market
    Retail

ALDI Green Hills, NSW

ALDI Green Hills, NSW

Prime Build have completed works on ALDI’s newest store in the Hunter region.

A first of its kind project for ALDI in Australia, the existing trading ALDI store was demolished in preparation for the new build. This made it a time critical project to ensure customers are not without there ALDI store for too long.

Prime Build’s scope included the demolition of existing building with the concrete slab elements being retained followed by the construction and fitout of an elevated new retail store and carparking works to the entire site.

Time was of the essence for this project, and as such Prime Build has implemented a range of time saving methodologies including the cast-in Pre Cast prop brackets and carefully sequenced pier / column / deck / precast trades to ensure the structure is erected as safely and efficiently as possible.

  • Market
    Retail

  • < Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • …
  • 7
  • 8
  • Next >

© Copyright Prime Build Pty Ltd

  • Contact
  • News
  • Sitemap
Website by Big Red Dog