Prime Build

  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact
  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact

Projects

  • All
  • Retail
  • Education
  • Government/Care
  • Rollout

Myer Docklands Head Office, VIC

Myer Docklands Head Office, VIC

After some successful projects partnering up with Myer, we were invited to carry out some work at their head office in Docklands, VIC.

This involved the complete strip out of 3 levels to bring the building back to original condition. Each level was approx. 1000m2 and needed to be completely stripped out including all offices, floor finishes and ceilings.

Following from this, new carpets, walls and ceilings had to be reinstalled to match a brand new building standard. This included modifying the building’s mechanical system, lighting and C-BUS along with fire services modification.

In addition to these 3 levels, we were commissioned to install a brand new entry foyer to Myer’s reception area on Level 1 with LED lit feature panels and a new automated sliding door.

Client
Myer

Market
Commercial


ALDI Green Hills, NSW

ALDI Green Hills, NSW

Prime Build have completed works on ALDI’s newest store in the Hunter region.

A first of its kind project for ALDI in Australia, the existing trading ALDI store was demolished in preparation for the new build. This made it a time critical project to ensure customers are not without there ALDI store for too long.

Prime Build’s scope included the demolition of existing building with the concrete slab elements being retained followed by the construction and fitout of an elevated new retail store and carparking works to the entire site.

Time was of the essence for this project, and as such Prime Build has implemented a range of time saving methodologies including the cast-in Pre Cast prop brackets and carefully sequenced pier / column / deck / precast trades to ensure the structure is erected as safely and efficiently as possible.

  • Market
    Retail

Coles Brighton, VIC

Coles Brighton, VIC

This complete refurbishment of Coles Brighton involved a demo of all existing items in store, re-lined walls and exposed ceilings, new services throughout, new flooring throughout and new shopfitting.

Other major works include refurbishment of the back of house and prep areas, additional electrical works, roof safety works and more.

Like many other projects, COVID restrictions posed challenges with reduced site capacity and a 2-week shutdown. By sequencing works properly so that we fully utilise the numbers allowed on site, we managed to push through and complete works to exceed the client’s requirements and expectations.

  • Client
    Coles
  • Market
    Retail

Kmart Melbourne CBD, VIC

Kmart Melbourne CBD, VIC

This transformation involved a complete conversion from the Bourke Street Mall Target to Kmart, making it the first CBD location for the brand.

Our scope was extended with an additional contract made for basement slab rectification where we achieved defect free completion. The project scope included full floor replacement, feature ceiling throughout, new entrances, escalator void augmentation, new lighting, column cladding and complete shopfitting.

A major challenge was the ceiling works but with effective communication and teamwork, we were able to closely monitor and successfully complete the works. Additionally, the start and end of the project were carried out in a live environment, with staged works and hoarding in place to ensure store operations keep running as smoothly and as safely as possible.

  • Client
    Kmart
  • Market
    Retail

Starbucks Grey Street, Brisbane, QLD

Starbucks Grey Street, Brisbane, QLD

Prime Build were engaged to complete a new store fitout at Grey Street Southbank in the central and popular Imax Cinema complex.

This project includes a de-fit of the existing premises and new store fitout within a four week programme. The new store is now complete with high level finishes of timber panelling and timber joinery species installed throughout the servery and perimeter walls including a polished terrazzo tile throughout. This spacious and modern fitout includes all elements for a fully functional specialist coffee shop with the option of indoor or outdoor dining.

Our extensive experience and knowledge in delivering live environment project across retail sectors was instrumental in delivering this tight time frame for our client whilst not disrupting the centre operations and neighbouring properties.

  • Client
    ALDI
  • Market
    Retail

McDonald’s Tamworth, NSW

McDonald’s Tamworth, NSW

Prime Build were delighted to be appointed to complete the newest McDonalds store in Tamworth, Upper Hunter Region of NSW.

The project scope involves the new build of a free-standing restaurant on a vacant site, including procurement & installation of substation with level 1 electrical connection, complete building construction, commercial kitchen and internal joinery and fit out, finished with external concrete pavements & landscaping.

Being a regional project posed many challenges with getting resources onsite while carefully managing the ever changing COVID restrictions. Prime Build had to plan strategically with subcontractors to manage program & costs carefully.

  • Client
    McDonald’s
  • Market
    Retail

  • < Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • 14
  • 15
  • Next >

© Copyright Prime Build Pty Ltd

  • Contact
  • News
  • Sitemap
Website by Big Red Dog