Prime Build

  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact
  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact

Projects

  • All
  • Retail
  • Education
  • Government/Care
  • Rollout

Prime Build Office, NSW

Prime Build Office, NSW

Located within Western Sydney University’s Engineering & Built Environment campus, Prime Build’s national headquarters

was carefully designed by the team at Conrad Gargett with simplicity, function and fun in mind. The Charter Hall developed; 6 Star Green Star building inspired us to follow suit and design our own Green Star rated fit out on Level 7.

Features which our own team delivered include polished concrete floors, open plan kitchen, spacious focused work areas and hot desk/collaboration zone, along with careful integration of the base build finishes to reduce waste. The front entry feature consists of sustainably sourced Victorian Ash timber battens and the cantilevered reception counter constructed using concrete with 20% ‘recycled plastic bags’ for aggregate!

Finally a carefully designed IT and AV system has been implemented, using the latest in MS TEAMS enabled equipment to make our users experience as seamless as possible.

  • Market
    Commercial

Monash University Clayton Campus – Informal Learning Space, VIC

Monash University Clayton Campus – Informal Learning Space, VIC

Prime Build were engaged to transform and repurpose their existing office space to an open Informal learning Space for staff and students at Monash University.

The space was constructed within a live  tertiary environment, being a foyer on the ground floor, we remained vigilant of the impact construction works would have on the wider Monash University community. We worked closely with the security team with proactive communication and provided weekly lookahead program to flag items of concern therefore subsequently mitigated potential disruptions.

Works includes new mechanical services, feature pendent lighting, individual working booths and timber hardwood fixed seating that spans across the entire back wall.

The project was delivered in full collaboration with Monash University’s project management teams.

  • Client
    Monash University
  • Market
    Education

McDonald’s Warrawong, NSW

McDonald’s Warrawong, NSW

This refurbishment of the McDonald’s in Warrawong included a full refurbishment of the dining area, kitchen, bathroom and playland as well as an extension to the kitchen.

To allow the restaurant to continue to trade, several live environment practices were implemented. Firstly, exclusion zones were created within the restaurant using hoarding while the dining area had work done. This meant that the store could still trade for walk in customers (served at the front counter) as well as drive thru.

The project was also done in stages to allow the restaurant to continue trade with the team working efficiently to make the most of good weather and complete external façade works and limit the time required to shut down the drive thru of the restaurant.

Through effective communication between the client and all other stakeholders, the team pulled together to deliver Prime Build’s first refurbishment for Mcdonald’s.

  • Client
    McDonald's
  • Market
    Retail

Winmalee Village, NSW

Winmalee Village, NSW

Prime Build’s scope for the Winmalee Village included an extension of external eating areas, installation of lift and shaft, 5 office complex fit outs, pylon signage and shade sail installation.

Set in the small town of Winmalee, Prime Build completed works in a live environment operating around foot traffic and a lot of local interest in the works.

Working closely with the centre manager and local business was key to finishing up defect free in this live environment.

  • Client
    ISPT
  • Market
    Retail

ALDI Salisbury, QLD

ALDI Salisbury, QLD

Prime Build pulled together to give the ALDI store in Salisbury an extension and a full refurb.

The first stage of the works was completed in a fully operational store with internal intrusive works performed outside of operating hours. To minimise disruption even further, we installed new temporary refrigeration equipment while removing existing equipment.

The second stage saw the store shut down for two weeks to expand the selling floor, fully refurbish the entire store and install and commission new refrigeration, coolrooms & freezers. Despite inclement weather affecting works on site, the project was completed on time and of high quality with a delighted client.

  • Client
    ALDI
  • Market
    Retail

Architect Studio, NSW

Architect Studio, NSW

Located in one of Sydney’s most iconic wharves, the architect's office fitout on Jones Bay Wharf brought two offices together.

Project Scope

  • Amalgamating Level 1 of two separate offices into one office.
  • Providing two separate entry and exit points to one of the two offices on the Ground Floor. One Entry/Exit to service the Ground Floor tenant and the other to service the Level 1 tenant. Inclusive of all Structural Steel and Glazed Partitions required to delineate between the two tenancies.
  • Complete fit-out of Level 1 Offices including:
  • Demolition of existing Glazed Partitions / Offices
  • Demolition of the existing wall dividing the two offices.
  • Removal of all existing Office Furniture and Joinery
  • Removal of all Existing Carpet / Floor Finishes.
  • Electrical and Communications works were required to merge new office space with existing office space. (Biggest scope of the project)
  • Construction of new lightweight Partitions / low Height Walls inclusive of painting works.
  • New Office Joinery – Plan Benches, Fixed Tables, Seats, Shelving and Feature Cladding.
  • New Floor Finishes (Both Carpet and Vinyl).
  • Coordination of Office Furniture delivery and installation.
  • Detailed Final Cleaning – Inclusive of Existing External Windows which required specialised abseiling Subcontractors.

Live Environment

Works on the Ground floor office were done in a live environment, with any electrical shutdowns, noisy works, dusty works or works which could interrupt or interfere with the day-to-day operations of the Ground Floor tenancy completed from midnight to 8:00 am so that the tenant would not be impacted. On completion of the night works Prime Build engaged a cleaner to clean any mutual access areas shared by the Ground Floor tenant. Any works which didn’t generate noise or dust were completed during the day.

Additionally, access to the busy Jones Bay Wharf was restricted requiring sign offs from security and no materials were allowed to be stored on site. As a workaround, Prime Build aimed to have any deliveries to site arrive before or after business hours when the wharf was least busy. Prime Build also worked with wharf security to arrange designated parking for all staff and subcontractors, which can be hard to find in any CBD.

Handover

The fitout was completed within two weeks, with the team working around the clock to ensure the project was completed on time and to the highest possible standard.

  • Market
    Commercial

  • < Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • …
  • 14
  • 15
  • Next >

© Copyright Prime Build Pty Ltd

  • Contact
  • News
  • Sitemap
Website by Big Red Dog