Prime Build

  • Sectors
    • Retail
    • Education
    • Residential
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact
  • Sectors
    • Retail
    • Education
    • Residential
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact

Projects

  • All
  • Retail
  • Education
  • Residential
  • Rollout

Nowra Anglican College, NSW

Nowra Anglican College, NSW

Prime Build have completed construction of a new learning environment for Year 4 at the Anglican Schools Corporation College in Bomaderry.

Construction of the new two-story teaching facility included basement excavation, bored piers, combination of AFS Redi wall and blockwork, 2 suspended slabs, and intricate raked structural steel roof system with metal roof and wall sheeting.

Surrounding irrigated landscaping and a raked structural steel roof system incorporating the covered accessible walkway.

The areas provide for a uniquely designed and detailed acoustic performance of the teaching rooms, including 3 GLA’s on level one, and a multipurpose room catering for before and after school and vacation care, uniform shop, kitchenette and storage area.

The upper-level outdoor area interfaces with the existing library building, bringing the areas together for students and teachers and meeting the growing needs of the learning community.

Client
Anglican Schools Corporation

Market
Education


Woolworths Richmond, NSW

Woolworths Richmond, NSW

A significant refurbishment to Woolworths Richmond was a key project showcasing the Retailer’s latest store concept.

Delivered by Prime Build, the works include upgrades to all customer and staff areas, such as refurbished amenities, back-of-house improvements, and a full upgrade of major services and refrigeration systems.

The store now features cutting-edge technology including Scan & Go, automated exit gates and new signage formats, enhancing both operational efficiency and the customer experience.

A strong on-site presence from the Woolworths team ensured the successful implementation of the brand’s latest retail initiatives, with Prime Build and Contractors delivering a highly coordinated effort.

The project not only reflects Woolworths’ commitment to innovation but also delivers a valuable result for the Richmond community through improved service, convenience, and sustainability.

  • Client
    Woolworths
  • Market
    Retail

ALDI Refresh Programme, NSW, ACT, QLD

ALDI Refresh Programme, NSW, ACT, QLD

International retailer ALDI Stores selected Australia as the first international market to rollout their fresh new look.

This saw the German based supermarket embark on an ambitious program to bring everyone of their fleet of stores to the same look and feel, requiring a flexible, innovative national contractor to deliver the intensive program, safely.

Prime Build were awarded the contract initially in NSW & ACT in 2017, which quickly expanded to QLD in 2018 to deliver these time critical refurbishment projects.

Our engagement was based on a schedule of rates, allocation model which saw Prime Build ultimately re -tender every year and provide savings of 3-5% annually to ALDI as a result of procurement savings and efficiencies that were made via learnings across our supply partner network.

  • Client
    ALDI

Chatham Primary School, VIC

Chatham Primary School, VIC

Prime Build were engaged by the VSBA following an extensive value engineering period which saw our team work collaboratively with the team at William Boags Architects to meet the tight budget for this Primary School transformation project.

A complex project respectfully transforming the 100-year-old building into a state-of-the-art Learning Centre with a totally redeveloped administration area and creating more space for play within the school’s beautiful grounds.

Works required extensive structural alterations with 20 tonnes of structural steel installed inside the existing building. New amenities block, teaching spaces, services and external façade upgrades, lift installation and landscaping works has called for careful integration with the school timetable to ensure the learning experience is not impacted, safety is not compromised and ensuring the project is completed within the tight timeframes.

The collaborative nature of the Prime Build Project Team and Site Manager, the Superintendent, the VSBA Project Officer and the School Principal sees the group work tirelessly together to achieve a great outcome for the Students, Teachers and Staff.

Whilst this project has thrown many challenges to the Project Team, financially due to the post COVID inflationary conditions and operationally due to the demands of the busy Live Environment, it is shaping up to be an amazing success.

Client
Victoria School Building Authority

Market
Education


Coles Merrylands, NSW

Coles Merrylands, NSW

Prime Build were excited to work with Coles to deliver their first new-look full refurbishment project for NSW.

Coles renewed format includes a range of innovative features such as an enhanced deli and seafood areas, refreshing juice bar and expanded fresh produce section.

Part of the project team’s brief was the relocation of the meat department to make way for the new Click and Collect section and supporting car park works to provide quick and convenient shopping accessibility for customers.

Extensive improvement works to the Bakery section led the project team to set up a temporary Bakery so not to disrupt the availability of this popular customer purchase.

Client
Coles

Sector
Retail


Vicinity Centres – Kmart Armidale, NSW

Vicinity Centres – Kmart Armidale, NSW

Prime Build were engaged by Vicinity Shopping Centre’s to complete the basebuild and fit out of a new Kmart store within the Shopping Centre.

The project involved the complete strip-out and removal of the existing Big W tenancy to facilitate Kmart’s relocation as the new tenant.

To advance the development, substantial essential services and infrastructure upgrades were undertaken to meet updated building codes and Australian standards.

These improvements included the installation of multiple water tanks and dedicated fire pumps for the tenancy, ensuring that sprinkler and hydrant flow rates complied with requirements given the existing limited supply to the Centre.

Additionally, the scope of work encompassed the construction of a new shopfront, as well as the design and implementation of Kmart’s latest store standards to align with the new layout.

Prime Build coordinated the base building works with the fit-out activities to ensure seamless delivery of the project in accordance with the timelines set by Vicinity and Kmart.

  • Client
    Vicinity Shopping Centres
  • Market
    Retail

  • < Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • …
  • 16
  • 17
  • Next >

© Copyright Prime Build Pty Ltd

  • Contact
  • News
  • Sitemap
Website by Big Red Dog