Prime Build

  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact
  • Sectors
    • Retail
    • Education
    • Government/Care
    • Commercial
    • Rollout
  • Responsibility
    • Sustainability
    • Safety
    • Financial
    • Community
  • About
    • Careers
    • Our Story
    • Team
    • Certifications
  • News
  • Contact

Projects

  • All
  • Retail
  • Education
  • Government/Care
  • Commercial
  • Rollout

South Windsor Enterprise Park, NSW

South Windsor Enterprise Park, NSW

Prime Build were engaged as the principal contractor for the construction of WST Property Group’s industrial development, South Windsor Enterprise Park.

The project comprises of 25 warehouse units, including ample car spaces and onsite accessible amenities. The warehouses are purpose built with areas ranging from 174sqm to 250sqm.

The construction method involved cast-in-situ concrete walls and concrete slab on ground. Each unit contains its own office area of structural steel construction, bathroom amenities and high bay clearance warehouse space.

With this being the first new venture in the area for some time, the development marks a new era in state of the art facilities with striking design and colour palette format, making it an attractive investment for local business and community.

Client
WST Property Group

Market
Commercial

 


Catch Photo Studio, VIC

Catch Photo Studio, VIC

Prime Build were engaged by the team at Catch following their acquisition by the Wesfarmers Group to design & construct a bespoke Photo Studio for the market leading online business.

Understanding the particular requirements of the Catch photography team, we carefully balanced the technical stipulations including lighting rigging, curtains & Cyclorama Wall within the incredibly tight lead times. Our construction methodology was carefully planned around these critical items which allowed the fit out to be completed with the Docklands A-Grade building on time and with zero defects.

The next time you make a purchase online @Catch, the chances are the image was created in this studio in Melbourne!

Client
Catch.com.au

Market
Commercial


Prime Build Office, NSW

Prime Build Office, NSW

Located within Western Sydney University’s Engineering & Built Environment campus, Prime Build’s national headquarters

was carefully designed by the team at Conrad Gargett with simplicity, function and fun in mind. The Charter Hall developed; 6 Star Green Star building inspired us to follow suit and design our own Green Star rated fit out on Level 7.

Features which our own team delivered include polished concrete floors, open plan kitchen, spacious focused work areas and hot desk/collaboration zone, along with careful integration of the base build finishes to reduce waste. The front entry feature consists of sustainably sourced Victorian Ash timber battens and the cantilevered reception counter constructed using concrete with 20% ‘recycled plastic bags’ for aggregate!

Finally a carefully designed IT and AV system has been implemented, using the latest in MS TEAMS enabled equipment to make our users experience as seamless as possible.

  • Market
    Commercial

Architect Studio, NSW

Architect Studio, NSW

Located in one of Sydney’s most iconic wharves, the architect's office fitout on Jones Bay Wharf brought two offices together.

Project Scope

  • Amalgamating Level 1 of two separate offices into one office.
  • Providing two separate entry and exit points to one of the two offices on the Ground Floor. One Entry/Exit to service the Ground Floor tenant and the other to service the Level 1 tenant. Inclusive of all Structural Steel and Glazed Partitions required to delineate between the two tenancies.
  • Complete fit-out of Level 1 Offices including:
  • Demolition of existing Glazed Partitions / Offices
  • Demolition of the existing wall dividing the two offices.
  • Removal of all existing Office Furniture and Joinery
  • Removal of all Existing Carpet / Floor Finishes.
  • Electrical and Communications works were required to merge new office space with existing office space. (Biggest scope of the project)
  • Construction of new lightweight Partitions / low Height Walls inclusive of painting works.
  • New Office Joinery – Plan Benches, Fixed Tables, Seats, Shelving and Feature Cladding.
  • New Floor Finishes (Both Carpet and Vinyl).
  • Coordination of Office Furniture delivery and installation.
  • Detailed Final Cleaning – Inclusive of Existing External Windows which required specialised abseiling Subcontractors.

Live Environment

Works on the Ground floor office were done in a live environment, with any electrical shutdowns, noisy works, dusty works or works which could interrupt or interfere with the day-to-day operations of the Ground Floor tenancy completed from midnight to 8:00 am so that the tenant would not be impacted. On completion of the night works Prime Build engaged a cleaner to clean any mutual access areas shared by the Ground Floor tenant. Any works which didn’t generate noise or dust were completed during the day.

Additionally, access to the busy Jones Bay Wharf was restricted requiring sign offs from security and no materials were allowed to be stored on site. As a workaround, Prime Build aimed to have any deliveries to site arrive before or after business hours when the wharf was least busy. Prime Build also worked with wharf security to arrange designated parking for all staff and subcontractors, which can be hard to find in any CBD.

Handover

The fitout was completed within two weeks, with the team working around the clock to ensure the project was completed on time and to the highest possible standard.

  • Market
    Commercial

Myer Docklands Head Office, VIC

Myer Docklands Head Office, VIC

After some successful projects partnering up with Myer, we were invited to carry out some work at their head office in Docklands, VIC.

This involved the complete strip out of 3 levels to bring the building back to original condition. Each level was approx. 1000m2 and needed to be completely stripped out including all offices, floor finishes and ceilings.

Following from this, new carpets, walls and ceilings had to be reinstalled to match a brand new building standard. This included modifying the building’s mechanical system, lighting and C-BUS along with fire services modification.

In addition to these 3 levels, we were commissioned to install a brand new entry foyer to Myer’s reception area on Level 1 with LED lit feature panels and a new automated sliding door.

Client
Myer

Market
Commercial


Officeworks Head Office Fitout, NSW

Officeworks Head Office Fitout, NSW

Prime Build worked with Officeworks to deliver a full refurbishment to their two-story Communications Head Office in North Rocks, NSW.

The project involved dividing the current space into four unique stages to maintain a live environment throughout the programme duration. Works included new wall and floor finishes, construction of new rooms such as a unisex bathroom, washroom, prayer room and multiple new glass partitioned meeting rooms.

Prime Build successfully created a modernised working environment to accommodate over 150 Officeworks team members.

  • Client
    Officeworks
  • Market
    Commercial

  • 1
  • 2
  • Next >

© Copyright Prime Build Pty Ltd

  • Contact
  • News
  • Sitemap
Website by Big Red Dog