ALDI McGraths Hill, NSW
![](https://primebuild.com.au/wp-content/uploads/2021/01/Website-Header-Photo-1.jpg)
ALDI McGraths Hill, NSW
ALDI McGraths Hill’s scope of works was broken into a series of sequenced stages over a 6 month programme to provide a major extension to the retail floor space.
![](https://primebuild.com.au/wp-content/themes/primebuild/img/green-button.png)
The extension involved a large suspended slab, structural steel structure & trussed roof, and a precast lift shaft to house a new passenger lift. The works were completed with ALDI’s new specified finishes & fixtures requirements and handed back to the store team to trade. Prime Build then took possession of the next stages.
Stage 3 included major demolition of the existing store entry ramp and a portion of the existing retail floor. Existing structural steel was modified and new steel / roof sheeting was installed across the store to then permit the construction of a new entry ramp. The store was also shutdown for a portion of stage 3 for store refurbishment works.
The significant staging & HAZMAT latent conditions were overcome by the delivery team to deliver this great looking store to the local community safely.
![](https://primebuild.com.au/wp-content/themes/primebuild/img/close-button.png)
![](https://primebuild.com.au/wp-content/uploads/2021/01/Website-Header-Photo-1.jpg)
![](https://primebuild.com.au/wp-content/themes/primebuild/img/lazy.png)
![](https://primebuild.com.au/wp-content/themes/primebuild/img/lazy.png)
![](https://primebuild.com.au/wp-content/themes/primebuild/img/lazy.png)
![](https://primebuild.com.au/wp-content/themes/primebuild/img/lazy.png)
![](https://primebuild.com.au/wp-content/themes/primebuild/img/lazy.png)
![](https://primebuild.com.au/wp-content/themes/primebuild/img/lazy.png)
![](https://primebuild.com.au/wp-content/themes/primebuild/img/lazy.png)
![](https://primebuild.com.au/wp-content/themes/primebuild/img/close-button.png)